From Development to Delivery: The New N3K CPT System
At Datem Ltd, innovation doesn’t stop at the drawing board. Our team has worked tirelessly to take the new N3K CPT system from concept to completion – delivering a robust, high-performance solution designed to meet the demands of today’s offshore environments.
Design Stage - Every detail carefully engineered to maximise strength, reliability and operational efficiency.
Load Testing - Rigorous structural testing of the bare frame to ensure it exceeds the toughest industry standards.
Final Build - A fully finished, precision-built system ready for deployment.
This project demonstrates our commitment to designing and delivering systems that our clients can trust, no matter how challenging the conditions.
This particular build is for a customer with a small moon pool. The CPT measures just under 138cm x 138cm.
Huge thanks to our engineering and production teams for their expertise and dedication throughout this process.
The Next Step in Development
Corporate News